The 737 design has reached its max (heh) potential. There's no more milk to squeeze out from this cow. Boeing has to bite the bullet and design a new plane from the ground up. Surely those billions in tax payer funded military contracts can be invested in R&D.
21 0 ReplyThe execs already plundered and pocketed all of the money
9 0 Replyfrom the ground up
hehe :)
5 0 Reply
4 years later around 150 new airplanes are still sitting on the tarmac as the crews fix around 6-7 per month.
It's pretty bizarre to drive past where they store/repair them in Moses Lake and see them all.
20 0 ReplyDidn't know, are they planes that never sold? Or were grounded? Or just don't have the resources to repair them?
3 0 ReplyMostly still grounded planes in need of repair.
There are a few planes that were ordered by Russia and Ukraine that can not be delivered due to the war. There are also a few planes that are unsold.
4 0 Reply
Not to be the Ackchyually guy here but producing aircrafts unfit for flying already emits a lot of greenhouse gases.
12 0 ReplyFake news, these planes are made of renewable materials, such as cardboard and greed.
13 0 ReplyNot to be the ackshually akshually guy but it says "since march 2019"
12 0 Reply
The greenest plane
7 0 Reply