Skip Navigation

Cosin begins heliostat assembly for 2 of 3 100MW Xinjiang tower CSP projects

www.solarpaces.org Cosin begins heliostat assembly for 2 of 3 100MW Xinjiang tower CSP projects

Press Release: Cosin Solar On January 24, the first set of heliostats for the 100MW CT CSP project of the POWERCHINA Turpan Tuokexun CSP + PV Hybrid Project, being constructed by Cosin Solar, was successfully assembled. The project, located in Tuokexun County, Turpan City, Xinjiang Uygur Autonomous ...

Cosin begins heliostat assembly for 2 of 3 100MW Xinjiang tower CSP projects

The project, located in Qiketai Town, Shanshan County, Turpan City, Xinjiang Uygur Autonomous Region, is invested by State Power Investment Corporation Henan Electric Power Co., LTD, with a total installed capacity of 1GW including 900MW PV and 100MW CT CSP. The 100MW CT CSP, with an 8-hour molten salt storage system, chose the molten salt tower CSP technology fully developed by Cosin Solar.

0
0 comments