Two questions about cities and their public transit infrastructure
It's been said many times already but cities really need to get their public transit in order so they can fix traffic congestation and improve the lives of their residents but I still have some questions about some ideas I had.
How much would it cost for a city to electrify their entire bus fleet? Yes, people taking the bus is still a good thing but a lot buses still run on some fossil fuel.
How much would it cost a city with no rail/metro infrastructure to create it from scratch?
Busses are replaced regularly anyway. An average bus in Germany for example is 8 years old, so 6-7% of all busses are replaced every year. Just buy electric busses when replacing the old ones instead of throwing out perfectly new combustion engine models. That's also more environmentally friendly, as a large part of its lifecycle pollution happens during the construction of a vehicle.
The other question is obviously highly dependent on the city (size, density, geology etc.) and the type of transit you're building (underground vs overground, separate rails vs. tram on streets etc). As a current example Hamburg is building a new subway line that'll go through the entire city (25km, 24 Stations, almost completely underground) is estimated to cost 15 billion €. So, depending on how mucch your city needs it could be anywhere between 10 and 100bn for a subway net. However, the national accounting will benefit 1.28€ for every 1.00€ that's spent, due to savings in travel times, fuel, cost for accidents and road maintenance, freed up real estate in the city etc. according to the calculations.
As soon as you add one electric vehicle, you also need to deploy your entire electric vehicle infrastructure. Generation, charging, maintenance, vendors, etc. Then until you retire your last legacy vehicle, you have to maintain your entire legacy infrastructure.
Yes, you need charging, maintenance, supply chain, etc. but in very limited quantities at first. Usually, pilots are started with a limited number vehicles, staff, routes, and infrastructure.
Similarly old vehicles are often phased out with as the depots, maintenance facilities, etc. are converted to support the new vehicles.
This is not only economically and environmentally efficient, but also operationally efficient. If you simply switch from one technology to another over a short period of time, you're opening yourself to minor issues causing major havoc.
If the average bus is 8 years old, that means that buses are replaced approximately after 16 years. According to this source, the average bus in New Zealand is more like 16 years old, so they're actually running for 32 years 😱
replacing an existing fleet of diesel transit buses with all EV literally pays for itself in lower maintenance and operating costs, even though the vehicles themselves cost as much as 50% more.
a couple of cost examples: the 15 mile extension (to the southwest burbs) of the LRT line that connects the downtowns of minneapolis and saint paul will end up with a final cost of around $200 million per mile. new underground subway lines/extensions in nyc have been built at costs over $1-2 billion per mile.
I think battery buses require extra road maintenance because they're so heavy. They'd be required to use truck routes or their roads would have to be updated to handle those weights.
Also EV charging infrastructure is not nothing.
In general, trolleybuses are probably the best electrification method, but people get mad about catenary.
Two recent examples from Finland, just numbers, you decide if it's a little or a lot.
When phase 1 of the "Länsimetro" subway extension from Helsinki city center to adjascent area and to the nearby suburbs was completed in 2018, it had cost 1188M€ for a 13.5 km route in challenging terrain, and 8 stations. To the best I could find, phase 2 completed in 2023 with 7.5km more route and 5 more stations, and cost 1070M€. This includes the infrastructure, not the vehicles.
The Tampere tram system (started from scratch) opened in 2021. Phase 1 route length was 15 km and 23 pairs of stops, as well as 10 new bridges and such, and cost 274M€+82M€ for the vehicles. Phase 2 is 95% done and 92% paid for, and currently the 7km, 9 stop(pairs) project is estimated to come to a total of 100M€+39M€ for the vehicles.
Regarding 1 - data is hard to find, apparently electric busses are 50-100% more expensive, but with lower operating costs. How much is uncertain. (requires digging into agency reports in languages I don't understand)
The good thing is that you don't have to throw good busses away in order to switch. Busses have a relatively short lifespan, about 15 years. They naturally come up for replacement anyway, and then you can buy electric ones instead.