Skip Navigation
aviation @lemmy.ml Shadow @lemmy.ca

Boeing Whistleblower: Production Line Has "Enormous Volume Of Defects", Bolts On MAX 9 Weren't Installed

viewfromthewing.com Boeing Whistleblower: Production Line Has "Enormous Volume Of Defects" Bolts On MAX 9 Weren't Installed - View from the Wing

A reader at respected airline industry site Leeham News offered a comment that suggests they have access to Boeing’s internal quality control systems, and shares details of what they saw regarding the Boeing 737 MAX 9 flown by Alaska Airlines that had a door plug detach inflight, causing rapid decom...

Boeing Whistleblower: Production Line Has "Enormous Volume Of Defects" Bolts On MAX 9 Weren't Installed - View from the Wing
6
6 comments
You've viewed 6 comments.